Before Leaving

TODO:

  • [ ] Add page-specific notes for runbooks/field-test-day/before-leaving.md after inspecting the real project files.
  • [ ] Cross-link Before Leaving to the most relevant code, data, testing, and safety pages.
  • [ ] Write the step-by-step procedure in the order it must be done.
  • [ ] List preconditions that must be true before starting.
  • [ ] List exact commands, files, hardware switches, and dashboard checks.
  • [ ] Add stop conditions where the runbook should be aborted.
  • [ ] Add evidence to save after completing the runbook.
  • [ ] Add post-run cleanup and sync steps.
  • [ ] Add test date, time, weather, route, model version, and manual takeover count.
  • [ ] Add what failed, what worked, and what data should be collected next.
  • [ ] Add the exact test command or manual test procedure.
  • [ ] Record expected result, failure result, and evidence to save.
  • [ ] Add the exact source path, artifact path, or hardware component name.
  • [ ] Add the command or procedure needed to reproduce the result.
  • [ ] Add expected inputs and outputs.