Zero 2W Dashboard

TODO:

  • [ ] Add page-specific notes for operations/zero-2w-dashboard.md after inspecting the real project files.
  • [ ] Cross-link Zero 2W Dashboard to the most relevant code, data, testing, and safety pages.
  • [ ] Write the exact command or procedure for this operation.
  • [ ] List which machine the command runs on and which paths it touches.
  • [ ] Document expected output and how long it usually takes.
  • [ ] Add danger notes for commands that can overwrite or delete files.
  • [ ] Add rollback or recovery steps if the operation goes wrong.
  • [ ] Add verification commands after the operation completes.
  • [ ] Add the exact source path, artifact path, or hardware component name.
  • [ ] Add the command or procedure needed to reproduce the result.
  • [ ] Add expected inputs and outputs.
  • [ ] Add the settings, flags, constants, or calibration values that control it.
  • [ ] Add known failure modes and how they appear in logs, video, or field behavior.
  • [ ] Add validation steps and pass/fail criteria.
  • [ ] Add links to related pages that a public reader should follow next.