Delete Risk
TODO:
- [ ] Add page-specific notes for
runbooks/sync-day/delete-risk.mdafter inspecting the real project files. - [ ] Cross-link
Delete Riskto the most relevant code, data, testing, and safety pages. - [ ] Write the step-by-step procedure in the order it must be done.
- [ ] List preconditions that must be true before starting.
- [ ] List exact commands, files, hardware switches, and dashboard checks.
- [ ] Add stop conditions where the runbook should be aborted.
- [ ] Add evidence to save after completing the runbook.
- [ ] Add post-run cleanup and sync steps.
- [ ] Add the exact source path, artifact path, or hardware component name.
- [ ] Add the command or procedure needed to reproduce the result.
- [ ] Add expected inputs and outputs.
- [ ] Add the settings, flags, constants, or calibration values that control it.
- [ ] Add known failure modes and how they appear in logs, video, or field behavior.
- [ ] Add validation steps and pass/fail criteria.
- [ ] Add links to related pages that a public reader should follow next.