Preflight Checklist

TODO:

  • [ ] Add page-specific notes for testing/field-testing/preflight-checklist.md after inspecting the real project files.
  • [ ] Cross-link Preflight Checklist to the most relevant code, data, testing, and safety pages.
  • [ ] State the test purpose and what risk it catches.
  • [ ] List exact setup steps, hardware state, and environment assumptions.
  • [ ] List the command, file, or manual procedure used to run the test.
  • [ ] Define pass, warning, and fail conditions.
  • [ ] Add what logs, screenshots, dashboard values, or videos to save.
  • [ ] Add what to do when the test fails.
  • [ ] Add when this test must be repeated.
  • [ ] Add test date, time, weather, route, model version, and manual takeover count.
  • [ ] Add what failed, what worked, and what data should be collected next.
  • [ ] Add the exact source path, artifact path, or hardware component name.
  • [ ] Add the command or procedure needed to reproduce the result.
  • [ ] Add expected inputs and outputs.
  • [ ] Add the settings, flags, constants, or calibration values that control it.